125. Water supply. The main pipe for the supply is to be of the strongest wrought hat-shaped tubing, with kerb roller joints. Elbows, Thrices and connections of wrought iron with full screws to pipe. Work less than 1 foot below ground line. All joints to be second quality and fixed together with red lead except those in connection with tanks which are to be flanged and painted in cement-composition.
All pipes within the building are to be laid with the crown of access: all outside pipes are to be carried up in chases left within the brickwork and cased. The whole of the water supply fittings are to be of metal and approved make, with full warranty and of the best quality, viz., haltons.
124 ...
... lean handles and geared.
130. Laying on. Lay on fittings because tout? ... with all necessary beads, connections and T-pieces, with 1" patent tubing bath: 3/4" to feed cisterns of hot water cistern and Rothen range, water closets, sinks, lavatory and washing basins. Baths to have 1" bib cocks, other fittings 3/4" – Also lay on "bibcocks west: 1" pipes and 1" bib cocks to coppers in wash house and with 1" pipe and 1/2" bib cocks to washing troughs and sinker.
131. Stop cocks. Provide and fix stop cocks with brass plugs and lever handles in positions as may be necessary for the control of the supply.
132. ...
"Was vide and fire in positions selected on the main four Chine's patent supply, with all pieces, gutta percha rings, bolts and surface boxes complete: the service for ... to be laid...
139. Water meter (?), Gas fitter.
134. Main and laying on. Connect to the ...
(
125. Water supply. The im fife for the subfly_
be
um
the of the throngest welded hatuut hubing,
with kerew rollar points. Elbows, Thrices
and connection of wrought iron with ful screws . Er pipe. Wobe less thom I fost medle for shed ground line . Ullfjoints D'u secand
And huch to tether with red lead sxcept those In connection with tanks which are the flanged and partied in corout-coment.
Ill pipes within the building an The Paid
to as the courmint of access : all butiend Jupes the canied up in chases left withe__ Frictionty and cased. The whole of the wate supply fitting, to be y fom metal & appeased
auch make, with full quality and of the
watu way, haltons.
124
Mand. -
lean handles and reared.
180. Lagringon. Layor fomuth becausch tout?
Luzon
reistims with all necessary
beads, cometion
and T frices, with 1" patent tubing bath : 3/4" to feed cisterns of hom water cistom and Rothen
range,
wath closets, sinks, Envatrin and
washing basins. Baths to have 1" bit
au
83
cartes, other getting 3⁄4/r" – Also lay
"bibcocks west : 1" pipes and 1" bib cocks to coppers I wash house and with 1" pipe and "/" " hib cocks to washing haughs and einser. 131 Stok cocks. Provide and fin insect
positio
Contal of the
as
may be necessary for the I of the cupply, a top cocks with brass plays and lever handler.
Fur plus
132.
A
"Was vide and fire in positions seluted on the more four Chine's patent fuipley, with & picces, gutta pencha mings, bolts und surface boxes complete : I'he served for bejade hate....
139. Wath metu (?),
Gas fitter.
184. Main and laying on. Correct to the air
No comments yet.
Private notes are available after approval.